Project Vision and Results
Delivering utility infrastructure for a mixed-use development.
This project supported an upcoming mixed-use residential development with ground-floor commercial space, which required integrated underground servicing for both residential and retail operations. Our team worked closely with Aragon and BC Hydro to manage service applications, approvals, inspections, and tie-ins, ensuring all duct banks, conduits, and service structures met utility standards for timely energization.
From excavation and trenching through installation, backfill, compaction, and surface restoration, we delivered the underground scope turnkey. Working within tight urban constraints and an active construction schedule, we coordinated with multiple trades while maintaining precise grades and required separations around existing utilities. The result was fully compliant, service-ready infrastructure installed efficiently and ready to support occupancy without delay.
Once again, I would like to thank you for the professional approach to the work completed. You’ve stood out amongst other companies each time, by having the right machine and qualified operator for the different variety of jobs already completed. Supervisors that understand time is money and at the same time making safety a priority.”
Toby King, Senior Superintendent
Aragon Construction Management Corp.